Project B
Installation of three BTU boilers at the Sloppy Floyd Twin Towers was complete and made operational just in time for the cool fall season. The existing boilers, pumps, flue, and piping were removed and replaced with this system.
Installation of three BTU boilers at the Sloppy Floyd Twin Towers was complete and made operational just in time for the cool fall season. The existing boilers, pumps, flue, and piping were removed and replaced with this system.